Over half a century of experience in RF shielding, anechoic chambers, and antenna measurement systems.

Chamber Installation

Chamber installation begins with careful site prep. We have built hundreds of chambers, of modular pan-type construction, metal-clad particle board panels, even foil-covered gypsum board.

Systems Engineering Support

We can support your engineering team to let them stay focused on the design work:

Technical writing to DoD, USAF T.O., Army TM, and NAVAIR standards as well as IEC 1082 and other commercial standards

Proposal preparation support: RFP/SOL review, requirements analysis, compliance matrices, document preparation and review

CDRL support: Job Hazard Analysis, System Safety Analysis and reviews; Human Engineering Analysis, studies, and reports; Test plan and procedure documentation; we have prepared submittals IAW dozens of Data Item Descriptions (DIDs) and we can assist your team with submittal preparation and review

Site Supervision

On-site supervisors coordinate chamber work with on-going construction activities and ensure rigid compliance with job site safety regulations and local procedures.

Testing Services

RF shield testing: IEEE-299, MIL-STD-285, NSA 65-6

CTIA CATL certification testing: Probe symmetry and amplitude ripple measurements following Test Plan for Wireless Device Over-the-Air Performance

Anechoic material test, inspection, remediation: VSWR, inverse spherical nearfield testing of installed material and NRL arch screening tests of individual absorber pieces

We can also provide in-process testing of welded steel shielded enclosures with a test technique based on ASME BPVC vacuum box testing—confirm quality of RF welds before the shield envelope is complete. We developed this method for testing the Navy’s Advanced System Integration Lab (ASIL) chamber at Patuxent River, shaving weeks off the construction/testing schedule.

Chamber Maintenance

Preventive maintenance for your system eliminates costly downtime and disruptions. We offer annual maintenance contracts for supported systems. And we are available for on-call maintenance when necessary.

Chamber Relocation

Anechoic material removal and packing for shipment, chamber disassembly and packing, transportation arrangement, and reassembly at your new location. Or, we can disassemble and remove your decommissioned chamber.

About Us

We formed Howland & Lawrence to carry on the legacy of The Howland Company, to continue providing the highest standard of customer support, and to work to achieve our clients' goals and share in their success. We have experience with all the leading chamber suppliers’ products--Lindgren, Universal, AP Americas, Panashield, Cuming Microwave, AEMI, ETS, Emerson & Cuming, and others—and we understand the unique requirements of each. Call us for service and repair, preventive maintenance, relocation, or removal.

Our goal is your success.

Every project begins and ends with the customer’s objectives. We will work with you to understand your challenges, define requirements, and develop a solution to accomplish your goals with minimum downtime. And we move aggressively to get from kick-off to completion quickly, safely, and efficiently.

  • Turnkey OTA test system: chamber construction, absorber installation, system installation and alignment

  • EMVAF, White Sands Missile Range

    High Power Mw Test Facility, White Sands Missile Range: Chamber characterization data acquisition & analysis

  • Radome test facility, MC-130H

    Validating safe DUT handling procedures

  • Site supervision

    Site supervision: coordinating chamber installation with building trades

  • AFRL Sensors Lab, WPAFB

    AFRL Sensors Directorate Compact Range, WPAFB: RF Shield testing & anechoic performance evaluation

  • CTIA CATL certification testing

    CTIA certification testing

  • F-35 inside Acceptance Test Facility

    Radar Cross Section (RCS) Test Facility Support

  • Acoustic Anechoic Chamber

    Acoustic Anechoic Chamber, Diamond Microwave

  • Anechoic material testing -- VSWR

    VSWR Testing, installed absorber in large facilities

  • 100% VSWR testing of anechoic material

    Absorber QA: 100% VSWR testing pre-installation

  • Tapered chamber relocation--during

    Chamber relocation services -- during

  • Tapered anechoic chamber relocation

    Chamber relocation services -- after